Another Yesterdecade project... entry...
Posted: Sat Feb 19, 2022 3:18 am
Strip the red shag carpet...
repair the threads and risers, added a center stringer and trued 'em up...
Both sets of stairs the top to bottom are kicked/racked ¾" the opposite way of each other.... (3" OOS)... raised the stair sets up 7/8" to equalize the top and bottom riser heights... Repaired, plumbed, and de-hacked the center wall. ..
made up thread covers to fit...
Installed a new garage access door (increase from 2/10 to 3/0) and tiled the landing....
.
repair the threads and risers, added a center stringer and trued 'em up...
Both sets of stairs the top to bottom are kicked/racked ¾" the opposite way of each other.... (3" OOS)... raised the stair sets up 7/8" to equalize the top and bottom riser heights... Repaired, plumbed, and de-hacked the center wall. ..
made up thread covers to fit...
Installed a new garage access door (increase from 2/10 to 3/0) and tiled the landing....
.
.
.
.
.